Meet Ya Min

    Composite Mechanics, PhD, Lead Engineer

    What is your role at LM Wind Power?
    My main responsibility is to develop new composite technology, for example, carbon and hybrid technology, and ensure high reliability for the present glass technology. Together with colleagues from the composite mechanics team, we are working with the highest industry standard to characterize the material and sub structure of wind turbine blades.

    Why work for LM Wind Power?
    I wanted to work for an international company with English as official language; secondly, I have always been doing research in the universities, so I would like to work for a company who has a big research group. Thirdly, I have a PhD in solid mechanics and research experiences in composite materials, which is very beneficial in this company. I think LM Wind Power is the perfect workplace for me.

    What’s the greatest challenge you face on the job?
    To combine my theoretical background with the knowledge and experience accumulated in LM Wind Power during three decades of blade production is the most interesting challenge I have. And it’s great being in an environment with so many highly skilled people. I am learning every day from my colleagues.

    Share this page

    And caption

    12-01-2018 11:40:50 | twitter

    LM Wind Power

    Blades from @LMWindPower, turbines from @GErenewables, inspiration and drive from @DeepwaterWind - great project for #BlockIsland and US #offshore wind https://t.co/DrDBcryfUs
    10-01-2018 12:34:59 | twitter

    LM Wind Power

    News from Clean #Energy Industrial Forum #CEICIF: “We need to talk about 10-20 bn EUR in R&D to achieve massive benefits for all #electricity users through the lower costs, not 1-2 bn” – Marc de Jong @LMWindPower #EUbudget #CleanEnergyEU https://t.co/fwdvxBLjE6
    02-01-2018 08:43:55 | instagram
    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! From all of us at LM Wind Power, we wish you a happy, greener new year. #CleanSleigh! #LMplaces #lmwindpower #newyear #newyearsresolution #reindeer #santa #christmas #innovation #greenbusiness #wind #windworks #windturbine #windturbines #renewables #windpower #windenergy #renewableenergy #cleanenergy #beautiful #future #love #sustainability #CaseForWind
    27-12-2017 08:36:26 | twitter

    LM Wind Power

    12 can't miss moments from 2017 - We'll let the headlines speak for themselves... https://t.co/hgalcxDUJc
    27-12-2017 08:32:45 | linkedin

    LM Wind Power

    It’s not easy to summarize a year’s worth of dedication, teamwork, challenges and successes from more than 8,000 people, so we’ll let our top headlines speak for themselves!
    24-12-2017 14:00:33 | twitter

    LM Wind Power

    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! https://t.co/xujuyiM1y0 From all of us, Season's Greetings and a greener New Year. #CleanSleigh! https://t.co/OztRUswue5
    24-12-2017 14:00:05 | linkedin

    LM Wind Power

    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! From all of us at LM Wind Power, Season's Greetings and a greener New Year. #CleanSleigh!
    21-12-2017 13:20:01 | linkedin

    LM Wind Power

    In October 2017 our 73.5 P wind turbine blade successfully arrived at Castellón port from our factory located 45 km away. This is the largest blade ever produced and transported in Spain and will be used for harvesting wind at the Merkur wind farm in the North Sea! Check out the transportation of the 73.5 P blade here: http://fal.cn/q5Fl This historic achievement also features in the latest GE report below!
    21-12-2017 13:00:04 | linkedin

    LM Wind Power

    In October 2017 our 73.5 P wind turbine blade successfully arrived at Castellón port from our factory located 45 km away. This is the largest blade ever produced and transported in Spain and will be used for harvesting wind at the Merkur wind farm in the North Sea! Check out the transportation of the 73.5 P blade here: http://fal.cn/q5bE This historic achievement also features in the latest GE report below!
    19-12-2017 01:27:35 | twitter

    LM Wind Power

    .@LMWindPower blade on a trip to the North Sea, via #Spain and #Netherlands, to be attached to offshore wind turbine nacelles from #France, to power #Germany - https://t.co/vbFMCcVkAs https://t.co/DnwZNE07ea